Gachsaran Petrochemical , E.P.C


Designing, Engineering, Purchasing, Constructing and Erecting of Ethane and Ethylene Double wall tanks
پتروشيمي گچساران
پتروشيمي گچساران
پتروشيمي گچساران
پتروشيمي گچساران
Kangan2
پتروشیمی کنگان
Kangan4
Kangan3

Kangan Petro Refining Company


Construction and installation of two propane and butane tanks

Ilam Petrochemical Co.


Supply, baking and charging perlite, tank and Cold box
پتروشیمی ایلام
پتروشیمی ایلام
پتروشیمی ایلام
پتروشیمی ایلام



The largest projects carried out over the past years




Item Description Project Name Starting Date Termination Date Owner
1 Construction and installation of one Mazut storage tank & Installation of 6 gas unit Rajaee Power Plant 02.12.93 11.11.94 Technikan
2 Construction & installation of 10 Cylindrical tank-  piping Installation & welding  , 30,000" Jajarm Alumina co. 95 20.03.99 NasbNiro
3 Construction & installation of duct & piping, 50,000" Gilan Combined Cycle Power Plant 97 19.02.98 NasbNiro
4 Construction & installation of boiler duct & Gas boiler inlet piping Arak Power Plant 19.03.2000 21.11.2001 NasbNiro
5 Installation & welding of two spherical tank-20,000 cubic meter Abadan Refinery Spherical Tank 2000 19.03.2001 Machin Sazi Arak
6 Installation & welding of two spherical tank-20,000 cubic meter Mashhad Spherical Tank 2002 21.11.2001 Machin Sazi Arak
7 Installation of 3 benzene storage tank with floating roof -installation and welding of two spherical tanks Ibn Sina Petrochemical 11.12.2001 20.03.2003 Ibn Sina Petrochemical
8 Assembly & installation of 2 ethylene double wall storage tank- diameter:38 m Maron Petrochemical 04.04.2002 16.03.2003 Maron Petrochemical
9 Construction & installation of 5 methanol storage tank, diameter 16&24 m Zagros petrochemical 2005 20.09.2006 Zagros Petrochemical
10 Repair & reinstallation of inner wall of ethylene tank Maron petrochemical 04.04.2006 21.09.2006 Maron Petrochemical
11 Repair & reinstallation of inner wall of ethylene tank Arya Sasol petrochemical 10.07.2005 14.11.2006 Ariya Sasol Petrochemical
12 Construction & installation of  2 spherical tank & 2 ethylene tank Morvarid petrochemical 05.04.2008 20.01.2010 Morvarid Petrochemical
13 Engineering, procurement & construction of second water intake Morvarid petrochemical 27.10.2008 20.01.2010 Morvarid Petrochemical
14 Construction and installation of  two ethylene and  two ethane Storage tank- piping thereof kavian Petrochemical 21.03.2005 19.04.2012 Kavian Petrochemical
15 construction and installation of 16 aluminum silo  and two spherical and cylindrical tank Mahabad Petrochemical 05.05.2011 13.11.2012 Mahabad Petrochemical
16 construction and installation of 19 aluminum silo Kurdistan Petrochemical 07.04.2013 22.05.2014 Kurdistan Petrochemical
17 Troubleshooting, redesign and modification of tank’s roof Morvarid Petrochemical 14.10.2014 21.11.2014 Morvarid Petrochemical
18 Procurement and construction of water & gasoline tank Kurdistan Petrochemical 03.08.2013 2014 Kurdistan Petrochemical
19 Remaining works of 9 floating & fix roof tank Ilam Petrochemical 06.08.2013 2014 Bina Consulting Engineers
20 Performing underground piping of Kurdistan site Kurdistan Petrochemical 20.02.2014 2014 Kurdistan Petrochemical
21 Procurement & construction of 2 stainless steel tank Kurdistan Petrochemical 21.03.2014 2014 Kurdistan Petrochemical
22 Construction & erection of 3 spherical tanks Ibnsina Petrochemical 06.11.2015 2016 Ibnsina Petrochemical